《教室里的激情》2,色av永久无码影院av,太子在御花园要了公主在花园,在火车和后妈妈谁在一起是什么书

COB Multi-mode Semi-Automatic Alignment Station

Active solution > COB Multi-mode Semi-Automatic Alignment Station > COB Multi-mode Semi-Automatic Alignment Station

COB Multi-mode Semi-Automatic Alignment Station

Introduction 

The alignment station is composed of automatic stepped module, visual orientation,automatic gluing and Marble vibration isolation system

4 axis high-precision stepper motor is used to adjust the parallelism between PCB and AWG with advanced structure design and fixture.

Place the PCB in fixed position and connect the socket to power up. PCBA is flattened by vacuum and pressing block,  the fixture could compatible with  many types of PCB products

Place lens on the collet and fix lens before alignment, by vacuum adsorption to facilitate lens loading. The position of lens on the suction nozzle is limited and fixed by mechanical structure. Replaceable suction nozzle to be compatible with different lens designs.

Advanced algorithm to realize the head and tail scanning, accurately calculate the coupling angle to realize multi-channel balance, calculate the flat area and common flat area of each channel. Scan the original data and save the test results to the database

A pressure sensor is designed perpendicular to the PCB direction to accurately locate the vertical alignment distance and prevent collision during the alignment process.

Advanced structure and marble vibration isolation design to ensure the responsivity change is less than 5% between before UV and after UV.

System Performance Index 

Specification

Requirements

 unit

Description

Products

10G/40G/100G

400G/800G

-

TX / RX,  SR1/SR4/SR8等

Alignment Materials

Lens

-


Axis accuracy

±0.5

±0.05

um

°


Repeatability

2%

-

Responsivity value repeatability during repeated alignment for the same material

Stability

5%

-

 Maximum responsivity value fluctuation  between before UV and after UV


Angle Accuracy

0.1

°

Maximum fluctuation of Coincidence degree in all channels trace.

Alignment Time

15

S

Time from no signal to capturing optical signal of one channel.

Cycle Time

4~5

Min

Time from load material to complete alignment(include 60S UV time).



主站蜘蛛池模板: 怀集县| 抚宁县| 台中市| 贵溪市| 霍城县| 大宁县| 宁津县| 扶绥县| 陕西省| 图们市| 出国| 江陵县| 遂宁市| 云和县| 洪江市| 桃园县| 宣汉县| 洛南县| 刚察县| 太保市| 青龙| 都江堰市| 中卫市| 金昌市| 益阳市| 长垣县| 沂南县| 永修县| 扬州市| 松原市| 朝阳区| 台东市| 南召县| 峨山| 越西县| 惠水县| 永胜县| 湘潭市| 海林市| 松阳县| 尼木县|